What we do — every job, every continent.

01 / 06

Pipeline Installation

Cross-country and gathering system installation for crude, refined products, and natural gas. Lines from 4″ to 48″, onshore and rig tie-in scopes.

02 / 06

Welding & Fabrication

Certified welding to API 1104 and ASME standards. SMAW, GTAW, FCAW, and mechanized welding crews — including high-volume mainline and complex tie-ins.

03 / 06

Hydrotesting & Commissioning

Pressure testing, dewatering, drying, nitrogen purging, and final tie-in to operating systems. Full documentation packages handed over to operations.

04 / 06

Coating & Corrosion Control

Field-applied joint coatings, FBE touch-up, cathodic protection coordination, and integrity monitoring scopes aligned to NACE/AMPP standards.

05 / 06

Inspection & QA/QC

Independent welding inspection, NDT coordination (RT, UT, MT, PT), traceable weld books, and operator-ready turnover documentation.

06 / 06

Crew & Supervision Supply

Welders, fitters, foremen, and superintendents mobilized to your project under your prime contract — vetted, ticketed, and ready on short notice.

Standards held.
Standards delivered.

We work to the codes that operators, EPCs, and regulators expect. Documentation packages aligned to client procurement and turnover requirements on every project.

API 1104
Welding of Pipelines & Related Facilities
ASME B31.4
Liquid Hydrocarbon Pipelines
ASME B31.8
Gas Transmission & Distribution
ASME IX
Welding & Brazing Qualifications
OSHA 30
Construction Safety & Health
ISO 45001
Occupational Health & Safety
ISO 9001
Quality Management Systems
NACE / AMPP
Coating & Corrosion Control
H2S
Sour Service Field Safety
IWCF
Well Control Familiarization
PED 2014/68/EU
Pressure Equipment Directive (EU)
CSWIP / AWS
Welding Inspection Standards
100%
Permit-to-Work Compliance
24/7
Site HSE Supervision
0
Compromise on Safety

Project inquiries.

If your project touches any of the six service areas above, send the scope. We'll come back to you with our read on it within two business days.

Have a scope?
We'll review it.

Send your tender package, scope of work, or capability questionnaire. We respond to qualified inquiries within two business days.

Submit a Project